Audit, conversion, recreation and validation of the geomatics, engineering and geological information including the resource block model from Vulcan into Surpac
Strategic mine planning (Conversion of mineral resources into mineable reserves based on applicable mine planning modifying factors)
Murowa Diamonds Mine
Rio Tinto, Zimbabwe (2015)
Open pit design (Creation of optimal pit designs including NPV practical pushbacks)
Waste dump design (Creation of optimal waste dump designs including practical dumping phases)
Sedibeng Iron Ore Mine
TATA Steel, South Africa (2015)
Audit and redesign of pit A and B, in accordance to Rock engineering parameters recommended by Worley Parsons
Sedibeng Iron Ore Mine
TATA Steel, South Africa (2015)
Annual business plan (Mine scheduling, financial modelling and reporting)
Sedibeng Iron Ore Mine
TATA Steel, South Africa (2015)
5 years business plan (Mine scheduling, financial modelling and reporting)
Navachab Gold Mine
QKR, Namibia (2015)
Life of Mine Plan (Mine scheduling, financial modelling and reporting)
Riozim Murowa Holdings Limited
Riozim Zimbabwe (2015)
K2 Life of mine planning (Pit design, Mine scheduling, financial modelling, peer reviews and reporting)
South Deep Mines (working under SRK)
Goldfields, South Africa (2015)
Review of mining methods, mining layouts and sequences, support designs and practice
Numerical modelling (Map 3D and phase 2), analysis and presentation of results and report writing
MSc research project on regional pillar monitoring
Sasol Mining (Pvt) Ltd (working under SRK)
Secunda, South Africa (2015)
The assessment of stability of the Twistdraai West shaft, the Bunker and the Decline using numerical methods tools such as Map3D, analysis and presentation of the results and report writing
Musonoi project (working under SRK)
Metorex, DRC (2015)
Assessment of surface displacement associated with underground mining as well as stability of the excavations using Map3D
Mintails’ 2L8 old tailings dam
Amasi (Pty) Ltd, South Africa (2015)
Conceptual, prefeasibility and feasibility study on relocating 350,000 bulk bench cubic metres of the tailings material for the purpose of freeing an area to be develop by Calgro M3 (Pty) Ltd
Planning, organizing, leading and controlling of earthmoving and earthworks activities
Liaising with Government, contractors, subcontractors, principal client, paymaster and Soweto community
Palabora Copper (Pty) Ltd (working under SRK)
South Africa (2015)
Assessment stress driven scaling on the raisebore perimeter using FLAC 3D.
Trojan Bindura Nickel Mine (working with Virimai Projects)
Zimbabwe (2015)
Crusher chamber support design
Global Platinum Resources (Working under Worley Parsons)
Zimbabwe (2015)
Prefeasibility study for support design
RioZim Murowa Holdings
RioZim, Zimbabwe (2016)
Audit, conversion, recreation and validation of the geomatics, engineering and geological information from Vulcan into Surpac
Strategic mine planning (Conversion of mineral resources into mineable reserves based on applicable mine planning modifying factors)
Jwaneng Diamond Mine
AngloAmerican, Botswana (2016)
Audit, conversion, recreation and validation of the geology data including the resource block model from GEMS into Surpac and Whittle
Cut 9 Strategic mine planning (Conversion of mineral resources into mineable reserves based on applicable mine planning modifying factors)